
雙組份打膠機(jī)定制流程是什么樣的
時(shí)間:2025-05-09 來源:http://www.wfjlbcml.cn/ 發(fā)布人:昌盛機(jī)械
專業(yè)定制流程說明
Professional Customization Process Description
第一階段:需求確認(rèn)
Phase 1: Requirement Confirmation
我們?yōu)槊课豢蛻襞鋫鋵夙?xiàng)目經(jīng)理,支持多種需求提交方式:
We provide dedicated project managers for each client and support multiple submission methods for requirements:
工程圖紙接收(支持CAD/SolidWorks等格式)
Engineering drawing reception (supporting CAD/SolidWorks and other formats)
樣品分析(提供到廠或寄送檢測(cè)服務(wù))
Sample analysis (providing on-site or shipping testing services)
工藝需求深度訪談(包含膠型特性、產(chǎn)能要求等12項(xiàng)技術(shù)參數(shù))
In depth interview on process requirements (including 12 technical parameters such as adhesive type characteristics and production capacity requirements)
第二階段:方案設(shè)計(jì)
Phase 2: Scheme Design
技術(shù)團(tuán)隊(duì)將基于您的需求提供:
The technical team will provide based on your needs:
設(shè)備選型建議:
Equipment selection suggestions:
AB膠比例范圍1:1至10:1可調(diào)
The proportion range of AB glue is adjustable from 1:1 to 10:1
出膠精度±1%的高精度計(jì)量系統(tǒng)
A high-precision measuring system with a dispensing accuracy of ± 1%
可選配加熱(最高80℃)或冷卻功能
Optional heating (up to 80 ℃) or cooling function
定制方案包含:
The customized plan includes:
3D布局示意圖
3D Layout Diagram
工藝流程圖解
Process flow diagram
智能化配置選項(xiàng)(視覺定位/自動(dòng)清洗等)
Intelligent configuration options (visual positioning/automatic cleaning, etc.)
第三階段:生產(chǎn)實(shí)施
Phase Three: Production Implementation
采用模塊化制造流程:
Adopting a modular manufacturing process:
核心部件德國(guó)原裝進(jìn)口(如:伺服驅(qū)動(dòng)系統(tǒng))
Core components imported from Germany (such as servo drive system)
出廠前完成72小時(shí)連續(xù)壓力測(cè)試
Complete a 72 hour continuous pressure test before leaving the factory
提供視頻預(yù)驗(yàn)收服務(wù),關(guān)鍵指標(biāo)包括:
Provide video pre acceptance services, with key indicators including:
混合均勻度檢測(cè)
Mixing uniformity detection
小點(diǎn)膠量驗(yàn)證(可達(dá)0.01ml)
Verification of small amount of glue (up to 0.01ml)
重復(fù)定位精度測(cè)試(±0.02mm)
Repeated positioning accuracy test (± 0.02mm)
第四階段:交付服務(wù)(STEP 07-08)
Phase 4: Delivery of Services (STEP 07-08)
完善的售后保障體系:
A comprehensive after-sales support system:
專業(yè)工程師上門安裝(含車間環(huán)境評(píng)估)
Professional engineer on-site installation (including workshop environment assessment)
現(xiàn)場(chǎng)操作培訓(xùn)(機(jī)械/電氣/工藝三級(jí)課程)
On site operation training (mechanical/electrical/process level three courses)
本文由全自動(dòng)鋁條折彎?rùn)C(jī)友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.wfjlbcml.cn我們將會(huì)對(duì)您提出的疑問進(jìn)行詳細(xì)的解答,歡迎您登錄網(wǎng)站留言.
This article is a friendly contribution from glass coating machine equipment For more information, please click: http://www.wfjlbcml.cn We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message
- 雙組份打膠機(jī)定制流程是什么樣的 2025/05/09
- 中空玻璃丁基膠涂布機(jī)在運(yùn)行的過程中可能會(huì)出現(xiàn)的問題 2025/05/07
- 全自動(dòng)鋁條折彎?rùn)C(jī)先進(jìn)的技術(shù)有什么? 2025/05/06
- 雙組份打膠機(jī)怎么操作? 2025/05/04
- 帶你了解全自動(dòng)丁基膠涂布機(jī)有哪些優(yōu)勢(shì) 2025/05/03
- 涂布機(jī)的工作原理、磨損原因及修復(fù)方法 2025/04/27
- 丁基膠涂布機(jī)是怎么操作的? 2025/04/25
- 玻璃涂布機(jī)的使用有什么優(yōu)勢(shì)? 2025/04/24
- 全自動(dòng)鋁條折彎?rùn)C(jī)技術(shù)在哪方面提升了 2025/04/19
- 全自動(dòng)封膠線有什么技術(shù)優(yōu)勢(shì)? 2025/04/18
產(chǎn)品分類Product categories
聯(lián)系我們Contact us
- 咨詢熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們: